Renovation Contracts in Ontario: What to Get in Writing

A handshake is not a renovation contract. Get the scope, price, payment schedule, timeline, change-order process, and warranty in writing before work starts. This is general guidance to help you prepare, not legal advice.

HomeCopilot Editorial

Most renovation disputes are really documentation disputes: two people remembering a verbal agreement differently. A written contract is not about distrust — it is the shared reference that keeps a good working relationship good when a surprise shows up behind the wall. Here is what a renovation contract in Ontario should put in writing before anyone starts.

What every renovation contract should include

  • The parties and licences — the legal business name, contact details, and proof of WSIB and liability insurance.
  • A detailed scope of work — what is included and what is explicitly excluded.
  • The total price and how it is structured — fixed price, or cost-plus with a cap, and what allowances are set.
  • A payment schedule tied to milestones — a reasonable deposit, progress payments, and a holdback until completion.
  • The timeline — start date, target completion, and how delays are handled.
  • The change-order process — how a surprise or a change becomes an agreed, written price BEFORE the work happens.
  • Warranty terms — on workmanship and on materials, in writing, with who to call.
  • Permits and responsibility — who pulls them, arranges inspections, and closes them.
  • Cleanup, site protection, and dispute resolution.

Payment and deposits

A modest deposit to secure a start date and order materials is normal; a large up-front payment is a warning sign. Tie payments to completed milestones so money follows progress, and keep a holdback until the punch list is finished. Ontario's construction and consumer-protection laws include specific rules — for example, holdback provisions on many projects and cancellation rights for certain contracts — so confirm the current rules for your situation rather than assuming.

Before you sign

  • Read the whole thing, including the exclusions and the fine print on allowances.
  • Make sure every verbal promise made during the sales visit is written into the scope.
  • Never start work on a verbal agreement or pay the full amount up front.
  • Keep a signed copy, and keep all change orders in writing as the job progresses.
  • For a large or complex job, consider having the contract professionally reviewed.

FAQ

Do I legally need a written contract to renovate in Ontario?

The law does not always require one for every job, but you should insist on it regardless. A written contract protects both sides, and for certain consumer contracts Ontario law adds specific requirements and cancellation rights — so a written agreement is both safer and often expected. This is general information, not legal advice.

What is a holdback?

A holdback is a portion of the payment you retain until the work is complete and any lien period has passed, as protection against unfinished work or unpaid subcontractors. Ontario construction law has specific holdback rules; confirm what applies to your project, or ask a professional to review the contract.